Kitchen renovation checklist: budget, permits, lead times, and punch list
By Checklist Directory Editorial Team• Content Editor
Last updated: August 8, 2026
Kitchen RemodelUpdated August 2026
Kitchen remodels run long when cabinets ship late and nobody planned where to boil pasta for six weeks. Lock layout and appliance specs before you sign a contractor. Hold real contingency cash. Set up a temporary kitchen the day before demo, not the morning the crew arrives.
Goals & Measurements
List every daily frustration in the current kitchen for one week
Rank must-haves vs nice-to-haves before opening design apps
Photograph every wall, ceiling corner, and under-sink area
Measure room length, width, and ceiling height twice
Measure window and door openings including trim thickness
Mark existing plumbing stubs, gas line, and electrical panel location
Note load-bearing walls before planning any opening changes
Record refrigerator, range, and dishwasher model numbers and cutouts
Sketch current cabinet runs with widths written on each box
Decide stay-in-home vs temporary housing for the dust months
Budget & Contingency
Set a hard ceiling budget before selecting finishes
Split budget into cabinets, counters, appliances, labor, and finishes
Park 15-20% contingency in a separate account you do not touch for upgrades
Price three cabinet paths: stock, semi-custom, and custom lead times
Get written allowances for tile, lighting, and hardware in every bid
Ask each bid what happens if drywall or plumbing surprises appear
Budget takeout and disposable dishware for the temporary kitchen weeks
Confirm payment schedule tied to inspections, not verbal milestones
Hold final 10% until punch list items are closed
Track change orders in a shared spreadsheet with date and cost
Design & Layout
Draft layout with sink, range, and fridge paths that do not collide
Verify aisle clearances against actual appliance door swings
Choose cabinet door style and finish before ordering samples of everything else
Select countertop material and edge profile with full-size samples at home
Pick backsplash after counters so grout color is not a scramble
Confirm flooring height transitions into adjacent rooms
Plan task lighting over sink and prep zones, not only pendants
Specify outlet and USB locations on the elevation drawings
Match appliance finish family (stainless, black stainless, panel-ready)
Lock sink model and faucet hole count before counter templates
Contractors & Bids
Collect three contractor referrals from recent kitchen jobs
Verify license, insurance, and workers comp certificates yourself
Visit or photo-review two finished kitchens from each finalist
Ask who pulls permits and who stands for inspections
Compare bids line by line, not just bottom totals
Confirm which trades are employees vs subcontractors
Put start date, finish target, and delay remedies in the contract
Name the daily site contact and preferred message channel
Hire a designer only if layout or millwork complexity needs it
Schedule plumber and electrician kickoff before demo starts
Permits & Codes
Call the building department with your exact scope before demo day
List which permits apply: building, electrical, plumbing, gas
Submit permit drawings with appliance cut sheets attached
Confirm GFCI and AFCI requirements for kitchen circuits
Verify range hood ducting rules for makeup air if required
Check HOA exterior vent or window rules if applicable
Schedule rough-in and final inspections on the shared calendar
Keep permit card posted on site until final sign-off
Confirm contractor liability coverage for the renovation period
File warranty paperwork for cabinets, appliances, and countertops
Temporary Kitchen
Set up a temporary cook zone with microwave, hot plate, and mini fridge
Move dishwasher-safe dishes and one sharp knife to a sealed bin
Protect floors on the path from demo zone to exterior dumpster
Seal the kitchen doorway with plastic and zipper for dust control
Relocate coffee maker and water filter where plumbing still works
Plan laundry-room or bathroom sink dishwashing for the rough weeks
Stock paper plates and trash bags for the no-sink stretch
Box pantry goods you will not cook with and store off-site if needed
Agree on daily cleanup expectations with the crew before demo
Tell neighbors about dumpster arrival and early start times
Lead Times & Ordering
Order cabinets only after final measurements and appliance specs lock
Get written cabinet lead time and write it on the project calendar
Order appliances early and confirm delivery windows in writing
Verify appliance dimensions against cabinet openings before truck day
Schedule countertop template after cabinets are set and leveled
Order flooring with 10% overage for cuts and future repairs
Buy lighting, faucet, and hardware before install week, not during
Confirm sink arrives before counter fabrication starts
Inspect deliveries same day and photograph damage before signing
Stage materials in a dry, locked area away from demo debris
Demo & Rough-In
Cap water and gas, then confirm shutoffs work before demo
Protect adjacent rooms and HVAC returns from fine dust
Remove cabinets carefully if any will be reused or donated
Photograph open walls before insulation and drywall close
Rough in new plumbing for sink, dishwasher, and fridge water
Rough in electrical for dedicated circuits and undercabinet lights
Frame any island or peninsula before first inspection
Pass rough plumbing and electrical inspections before covering walls
Hang and finish drywall, then prime before cabinets arrive
Write down what fails daily for one week: not enough prep space, one dim corner, a dishwasher that never dries. Rank fixes before you scroll Pinterest. Measure wall lengths, ceiling height, and window-to-counter spans. Photo under-sink plumbing and panel location; surprises live there.
Budget and contingency
Set a number you will not exceed, then split it across cabinets, counters, appliances, labor, and finishes. Move 15 to 20 percent into a side account for unknowns behind walls. Upgrades come from savings, not from contingency. Change orders eat contingency faster than fancy tile.
Design and layout
Draw the work triangle so fridge, sink, and range do not block each other when two people cook. Open appliance doors in the plan to check aisle width. Pick cabinet door style early; everything else samples against it. Confirm vent path to exterior before you order a hood that cannot exhaust anywhere.
Contractors and bids
Ask friends for three recent kitchen contractors, not general handymen. Verify license, insurance, and workers comp yourself; do not trust a PDF forwarded once. Visit two finished jobs per finalist or ask for detailed photos with dates. Compare bids line by line, not lump sum vibes.
Permits and codes
Call the building department with your scope before demo. Know whether you need separate electrical, plumbing, or gas permits. Submit drawings with appliance spec sheets attached. Unpermitted work shows up on resale and voids insurance when a pipe leaks.
Temporary kitchen
Park a table with microwave, hot plate, and mini fridge away from dust. Keep one pot, one knife, and dishwasher-safe plates in a labeled bin. Tape floor protection on the path to the dumpster. Accept that you will eat simpler food for a while; the goal is function, not gourmet.
Lead times and ordering
Field-measure for cabinets only after layout and appliance models are final. Get cabinet lead time in writing on the calendar in red. Order appliances early; delivery windows slip. Do not tile before cabinet install unless your contractor explicitly wants that sequence.
Demo and rough-in
Shut water and gas, then test valves before swinging hammers. Seal HVAC returns and doorways to keep dust out of bedrooms. Salvage cabinets or counters only if you have a buyer lined up; they stack in the garage forever otherwise.
Install sequence
Hang uppers on a laser line, screwed into studs, not just drywall. Set lowers level and shim until doors align. Dry-fit sink and cooktop cutouts before stone arrives. Test dishwasher drain and disposal wiring before closing walls.
Punch list and closeout
Open every drawer and door; adjust soft-close hinges. Run the dishwasher empty and watch under-sink joints for drips. Preheat the oven, boil water on each burner, and run the hood on high. Write punch items on paper during walkthrough; verbal promises fade by Friday.